datasheetbank_Logo
データシート検索エンジンとフリーデータシート

JANKCA1N5554US データシートの表示(PDF) - Unspecified

部品番号
コンポーネント説明
一致するリスト
JANKCA1N5554US Datasheet PDF : 28 Pages
First Prev 11 12 13 14 15 16 17 18 19 20 Next Last
MIL-PRF-19500/420H
* TABLE II. Group E inspection (all quality levels) for qualification and requalification only - Continued.
Inspection
* Subgroup 8
Peak reverse power
Electrical measurement
Subgroup 9 1/
Resistance to glass
cracking
* Subgroup 10
Forward surge
Electrical measurement
Method
MIL-STD-750
Conditions
Sampling
plan
See 4.5.5 herein. Peak reverse power (PRM)= shall be
characterized by the supplier and this data shall be available
to the Government. Test shall be performed on each sublot.
During the PRM test, the voltage (VBR) shall be monitored to
verify it has not collapsed. Any collapse in VBR during or
after the PRM test or rise in leakage current (IR) after the test
that exceeds IR1 in table I shall be considered a failure to that
level of applied PRM. Progressively higher levels of PRM shall
be applied until failure occurs on all devices within the
chosen sample size to characterize each sublot.
1057 Step stress to destruction by increasing cycles or up to a
maximum of 25 cycles.
n = 45
4066
IFSM = 80 A(pk); 10 surges of 8.3 ms each at 1 minute
intervals, superimposed on IO = 2 A dc; VRWM = rated VRWM
(see col. 3 of 1.3). TA = +100°C.
See table I, subgroup 2 and table III herein.
22 devices
c=0
1/ The sample size for this step stress requirement shall be determined by the supplier. A statistically significant
sample size is required.
20

Share Link: 

datasheetbank.com [ Privacy Policy ] [ Request Datasheet ] [ Contact Us ]